Sign In | Join Free | My spintoband.com
spintoband.com
Suzhou orl power engineering co ., ltd
Suzhou orl power engineering co ., ltd Specializing in the production boiler unit China suppliers
Home > Water Wall Panels >

35 Ton Petroleum Steam Boiler Water Wall Tubes ORL Power SGS With Hot Water

Suzhou orl power engineering co ., ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

35 Ton Petroleum Steam Boiler Water Wall Tubes ORL Power SGS With Hot Water

Brand Name : ORL Power
Model Number : Customization
Certification : ISO9001/SGS/TUV/ASME/EN
Place of Origin : Zhangjiagang,Jiangsu,China
MOQ : 1 Set/Sets 10tons
Price : Contact me | Get Latest Price
Payment Terms : T/T
Supply Ability : 500Ton/Tons per Month
Delivery Time : 50~100 Days
Packaging Details : Iron Frame Package
Condition : New
Feature : Environment Friendly, easy to install
Usage : Industry/Power Station
Structure : Fire/Water Tube
Pressure : High/Low Pressure
Fuel : Coal/Gas/Oil-fired, Water Heat
Material : Wood Plastic Composite
Dimension(L*W*H) : Customization
Weight : 10~1000ton
Contact Now

35 Ton 200 MW Weight Scale Petroleum Waste Heat Garbage Gas Steam Water Wall Panels ORL Power SGS with Hot Water


Power 35 Ton 200 MW Weight Scale


Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube


Quick Detail:

Petroleum Waste Heat Garbage Gas Steam Water Wall Panels

• Alloy steel, carbon steel or as per customer’s requirements

• Good quality, good service, short delivery time


Description:

Petroleum Waste Heat Garbage Gas Steam Water Wall Panels can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.


The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.


Applications:

The main Petroleum Waste Heat Garbage Gas Steam Water Wall Panels is Widely used for power plant, power station, etc.


Hot rolled seamless steel tubes and cold rolled seamless steel tubes for steam boiler systems

1.Implementation of the same standard, medium and low pressure boiler tube standards can be used. Hot rolled or cold-rolled (drawn) seamless steel tubes with high quality carbon structural steel.

2.The 2 main 10, 20 steel manufacturing, in addition to ensure the chemical composition and mechanical properties of things do pressure test, curling, flaring and flattening test.

3.Hot rolling in hot rolling, cold rolling (DIAL) in heat treatment delivery.


WHY US:


1. Our Advantages:

A: The first and most important, we have our own tooling factory. We can develop different panels according to your requirements or samples.

B: We produce all products from the raw materials, so our price is very competitive.

C: We have advanced production line and professional team.

D: Each order will be delivered on time.

E: We have more than 10 years of production experience.

F: Quality is controlled according to ISO9001:2000 system.


2. Our Services:

A: Your inquiry related to our product & price will be replied within 24hours.

B: Well-trained & experienced stuff are to answer all your inquiries in English of course.

C: Working time: at your service in 24 hours.

D: Good after-sale service offered, please get back if you got question.

E: We respect the feedback after you receiving the goods. We will handle your complaint within 48 hours.


How do order?


Step 1: Tell us your requirements

Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to

you as the alternative

Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement

and sign contract.

Step 4: Advanced payment and production

Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract.

Step 6: Balance payment and shipping

Step 7: Handing Shipping files to help clients get goods from transporter in time.

Step 8: Clients get goods and go into warranty time


Name&TypeSupply Ability:FOB Price
Boiler drum100Ton/Tons per MonthContact Me Get Latest Price
Boiler header100Ton/Tons per MonthContact Me Get Latest Price
Boiler waterwall panel500Ton/Tons per MonthContact Me Get Latest Price
Boiler economizer500Ton/Tons per MonthContact Me Get Latest Price
Boiler super heater300Ton/Tons per MonthContact Me Get Latest Price
Boiler air preheater300Ton/Tons per MonthContact Me Get Latest Price
Other300Ton/Tons per MonthContact Me Get Latest Price

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube


Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater


Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection


Certifications

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.



Product Tags:

boiler water tube

      

boiler panel

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

35 Ton Petroleum Steam Boiler Water Wall Tubes ORL Power SGS With Hot Water Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Suzhou orl power engineering co ., ltd
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0